EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4SO) > Purge Control Solenoid Valve

INSTALLATION

Install in the reverse order of removal.

Tightening torque:

19 N·m (1.9 kgf-m, 14.0 ft-lb)

NOTE:

Connect the evaporation hose as shown in the figure.

(A)

To fuel pipe (evaporation line)

(B)

To intake manifold