EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > Secondary Air Combi Valve

INSTALLATION

1. SECONDARY AIR COMBINATION VALVE LH

Install in the reverse order of removal.

NOTE:

Use a new gasket.

DOHC Non-turbo model

Tightening torque:

T1: 9 N·m (0.92 kgf-m, 6.6 ft-lb)

T2: 19 N·m (1.9 kgf-m, 14 ft-lb)

(A)

Secondary air combination valve LH

(B)

Clamp

(C)

Air duct

(D)

Gasket

(E)

Secondary air pipe LH

(F)

Gasket

Turbo model

Tightening torque:

T1: 9 N·m (0.92 kgf-m, 6.6 ft-lb)

T2: 19 N·m (1.9 kgf-m, 14 ft-lb)

(A)

Secondary air combination valve LH

(B)

Clamp

(C)

Air duct

(D)

Gasket

(E)

Secondary air pipe LH

(F)

Gasket

2. SECONDARY AIR COMBINATION VALVE RH

Install in the reverse order of removal.

NOTE:

Use a new gasket.

DOHC Non-turbo model

Tightening torque:

T1: 6.4 N·m (0.65 kgf-m, 4.7 ft-lb)

T2: 19 N·m (1.9 kgf-m, 14 ft-lb)

T3: 9 N·m (0.92 kgf-m, 6.6 ft-lb)

(A)

Secondary air combination valve RH

(B)

Clamp

(C)

Air duct

(D)

Gasket

(E)

Secondary air pipe RH

(F)

Gasket

Turbo model

Tightening torque:

T1: 9 N·m (0.92 kgf-m, 6.6 ft-lb)

T2: 19 N·m (1.9 kgf-m, 14 ft-lb)

(A)

Secondary air combination valve RH

(B)

Clamp

(C)

Air duct

(D)

Gasket

(E)

Secondary air pipe RH