EMISSION CONTROL (AUX. EMISSION CONTROL DEVICES)(H4DO) > Two-way Valve

INSTALLATION

Install in the reverse order of removal.

Tightening torque:

25 N·m (2.5 kgf-m, 18 ft-lb)