BRAKE > Hill Holder

INSTALLATION

1. PHV (PRESSURE HOLD VALVE)

1. Attach the PHV to the side frame.

Tightening torque:

18 N·m (1.8 kgf-m, 13.0 ft-lb)

2. Connect the brake pipe to the PHV.

Tightening torque:

15 N·m (1.5 kgf-m, 11.1 ft-lb)

CAUTION:

Check that there is no deformation or damage on the brake pipe. If necessary, replace with a new part.

3. Attach the PHV cable to the PHV.

CAUTION:

If the cable clamp (and clip) is damaged, replace it with a new part.

Do not bend the PHV cable sharply to avoid damage.

4. Connect the PHV cable with a clip.

5. Apply grease to the following locations.

Return spring hook position

Lever cable end portion

Grease:

KOPR-KOTE (Part No. 003603001)

6. Bleed air from the brake system.

7. Adjust the PHV cable.

CAUTION:

After replacing with a new PHV cable, operate the clutch pedal approximately 30 times to break it in, then perform adjustment.

2. PHV CABLE

1. The installation of the PHV cable is performed in the reverse order of removal.

CAUTION:

If the cable clamp is damaged, replace it with a new part.

Do not bend the PHV cable sharply to avoid damage.

2. Apply grease to the following locations.

Return spring hook position

Lever cable end portion

Grease:

KOPR-KOTE (Part No. 003603001)

3. Adjust the PHV cable.

CAUTION:

After replacing with a new PHV cable, operate the clutch pedal approximately 30 times to break it in, then perform adjustment.