MANUAL TRANSMISSION AND DIFFERENTIAL(5MT) > Switches and Harness

INSTALLATION

1. BACK-UP LIGHT SWITCH & NEUTRAL POSITION SWITCH

1. Install the back-up light switch & neutral position switch with the harness.

Tightening torque:

32.3 N·m (3.3 kgf-m, 23.8 ft-lb)

(A)

Neutral position switch (Brown)

(B)

Back-up light switch (Gray)

2. Connect the connectors of back-up light switch & neutral position switch.

3. Install the air intake duct and air cleaner case. (Non-turbo model)

4. Install the intercooler. (Turbo model)

5. Connect the battery ground cable to the battery.

2. HIGH-LOW SWITCH

1. Install the high-low switch.

Tightening torque:

32.3 N·m (3.3 kgf-m, 23.8 ft-lb)

2. Attach the high-low switch cable to the clamp.

3. Connect the high-low switch connector.

4. Install the air intake duct and cleaner case.

5. Connect the battery ground cable to the battery.