CHECK WASTEGATE CONTROL SOLENOID VALVE.

1) Remove the wastegate control solenoid valve.

2) Measure the resistance between wastegate control solenoid valve terminals.

Terminals

No. 1 — No. 2:

QUESTION

Is the resistance between 30 — 34 Ω?

Yes No

Replace the wastegate control solenoid valve.