AUTOMATIC TRANSMISSION(4AT) > Front Differential Assembly

INSTALLATION

1. Install the front differential assembly to the converter case.

NOTE:

Be careful not to damage the inside of the converter case (especially the mating surface of the differential side retainer).

(A)

Front differential ASSY

2. Install the O-ring to left and right side differential retainers.

3. Install the differential side retainers using ST.

ST    18630AA010 WRENCH COMPL RETAINER

NOTE:

ST      WRENCH ASSY (499787000) can also be used.

4. Adjust the backlash of the front differential.

5. Install the lock plate.

Tightening torque:

25 N·m (2.5 kgf-m, 18.4 ft-lb)

(A)

Lock plate

6. Install new seal pipe to converter case.

(A)

Seal pipe

7. Install the converter case to the transmission case.

8. Insert the inhibitor switch and transmission harness connector to the stay.

(A)

Transmission harness connectors

(B)

Inhibitor switch connector

9. Install the ATF cooler pipe.

10. Install the oil charge pipe together with an O-ring.

11. Insert the input shaft while rotating it lightly by hand, and then check the amount of protrusion.

Normal protrusion A:

50 — 55 mm (1.97 — 2.17 in)

12. Install the torque converter clutch assembly.

13. Install the transmission assembly to the vehicle.