MANUAL TRANSMISSION AND DIFFERENTIAL(6MT) > Switches and Harness

INSTALLATION

1. BACK-UP LIGHT AND NEUTRAL POSITION SWITCH

1. Install the back-up light switch and neutral position switch together with harness.

Tightening torque:

32.3 N·m (3.3 kgf-m, 23.8 ft-lb)

(A)

Neutral position switch

(B)

Back-up light switch

2. Install the transmission under cover.

3. Connect the connector of back-up light switch and neutral position switch.

4. Install the intercooler.

5. Connect the ground cable to battery.