CHECK HARNESS CONNECTOR BETWEEN BODY INTEGRATED UNIT AND SHIFT LOCK SOLENOID.

Measure the harness resistance between the body integrated unit and chassis ground.

Connector & terminal

(B279) No. 12 — Chassis ground:

QUESTION

Is the resistance 1 MΩ or more?

Yes No

Repair the short circuit of harness between body integrated unit and shift lock solenoid connector.