CHECK HARNESS.

1) Turn the ignition switch to ON.

2) Using the tester, measure the voltage between terminals of data link connector and chassis ground.

Connector & terminal

(B40) No. 6 — Chassis ground:

(B40) No. 14 — Chassis ground:

QUESTION

Is the voltage 6 V or more?

Yes No

Replace the body integrated unit.